• Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
  • Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
  • Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
  • Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
  • Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
  • Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days

Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days

After-sales Service: Online
Warranty: 6 Months
Certification: TUV, ISO, RoHS, CE
Condition: New
Rated Load: 300kg
Transmission: Hydraulic
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 7 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (16)
  • Overview
  • FAQ
Overview

Basic Info.

Load and Unload Mode
Front Discharge
Walking Mode
Wheeled/Tracked
Type
Small Loader
Rated Speed Rpm
3600
Number of Cylinders
2
Delivery Time
10-15days
Unloading Distance
450
Transport Package
Nude Package
Specification
2206*1100*1350mm
Trademark
Grizzly
Origin
Qingdao, Shandong, China
HS Code
8429510000
Production Capacity
12000 Sets/Year

Product Description

In today's dynamic and rapidly evolving industrial landscape, the demand for cutting-edge machinery has never been more critical in driving efficiency and productivity to unprecedented heights. Leading this technological revolution is the sliding machine, a cornerstone tool renowned for its indispensable role across multiple industries. This innovative equipment ensures seamless and precise material handling, making it an essential asset in both the manufacturing and construction sectors. Its superior performance is attributed to its capability to execute a wide range of functions with exceptional accuracy. By integrating the sliding machine into daily operations, businesses can significantly streamline their processes and achieve outstanding productivity milestones. Without a doubt, the sliding machine stands as an invaluable pillar in any modern industrial setting.
Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
entry name parameter entry name parameter
Engine brand Science popularization/Bailitong Maximum operating height 2450
Rated power KW 14-17KW To bucket pin height 1870
Rated speed rpm 3600 Vehicle height 1350
Number of cylinders 2 Maximum height of the bucket when placed flat 1810
Air intake method natural Total length without attachments 1680
Displacement cc 639 With standard bucket total length 2206
emission standard Euro 5 Maximum height unloading angle 34°
Rated load kg 300 Unloading height 1510
Maximum load kg 400 Unloading distance 450
Maximum digging force KN 450 The flipping angle of the bucket on the ground 27°
Bucket volume m3 0.12 Bucket flipping angle at maximum 114°
Driving speed km/h 0-6 Wheelbase 850
Work three items and s 9 Ground clearance 150
Working system pressure bar 17-21 Tail length 280
Fuel tank volume L 10 Track width (standard tires) 720
Operating Quality Kg 1200 Vehicle width (standard tires) 1100
Tire model 18*72 Bucket width 1000

Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days

Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days

Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days Industrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15daysIndustrial Loader Arm with Quality Loader Machinery Equipment and Delivery Time: 10-15days
FAQ

Q1: Are you a manufacturer or a trade company?

We are a professional manufacturer.Currently, the Grizzly production base is proud to operate an advanced production facility, boasting an impressive capacity to produce 15,000 small loaders each year.

Q2: What measures do you take to ensure your clients receive top-quality products?

We regard quality with the utmost importance, treating it as essential as life itself! Our rigorous quality control system ensures precision at every stage of the manufacturing process. For example, we meticulously inspect the welding strength of each component prior to packaging, and our machines undergo an exhaustive 48-hour no-load running test before dispatch.

Q3: How do you maintain consistent quality?

We maintain a detailed bond file for each client, accurately documenting every order placed. We do not alter the bond for clients' orders unless there is an explicit request or a technological advancement necessitates changes.

Q4: What value-added services do you offer?

We accommodate ODM & OEM orders, offering customization with your company's logo on the product. The minimum order quantity (MOQ) is approximately 20 units.

Q5: What payment terms does your company accept?

1. 30% TT as a deposit, with the balance due before shipment. 2. LC at sight or within 90 days is also accepted. 3. Trade assurance, PayPal, and Western Union are additionally accepted.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
5000000 RMB
Plant Area
20000 square meters